RT @OxfordClarion: The Oxford–Didcot railway line is likely to be closed for up to three weeks due to the failure of Nuneham Viaduct over the Thames. The speed limit was reduced to 20mph in January, 5mph last week, then closed entirely today, with the line said to be “sinking” into the ground.
🐦🔗: https://n.respublicae.eu/JeanLambertLDN/status/1642936220199141398